PakistanTalk Forum

 

Go Back   PakistanTalk Forums > World Politics & Defence > India


India Forum to discuss Indian national politics and strategic defence issues on indian air force, navy, army and nuclear/missile forces.

Reply
 
LinkBack Thread Tools Display Modes
Old 02-16-2011, 10:05 PM   #1 (permalink)
Senior Member
Colonel
 
sonicboom's Avatar
 
Join Date: Mar 2010
Posts: 1,595
Thanks: 35
Thanked 144 Times in 116 Posts
Default Advanced Version of MBT Arjun Mark-II To Undergo Serial Production in 2014

Advanced Version of MBT Arjun Mark-II To Undergo Serial Production in 2014


After more than 90 upgrades, an advanced variant of the indigenous Main Battle Tank (MBT) Arjun will undergo serial production in 2014.
The tank, Arjun Mark-II, will be equipped with an indigenous engine a year after the start of its serial production to replace its German power plant, Defence Research and Development Organisation (DRDO) officials told PTI.
"The advanced Arjun will be equipped with Explosive Reactive Armour and missile-firing capability from its main gun and better night-vision capabilities," they said.

The officials said that the gear box of the tank too would be upgraded to improve its performance.

Meanwhile, the DRDO has decided to go ahead with the first phase of the tank''s trial in June this year. "The user-Indian Army- would be involved in the trial from the phase one itself. The second phase would take place sometime early next year," said the officials.

124 Arjun Mark-I tanks, comprising two regiments, have already been inducted into the Army after being manufactured in Heavy Vehicles Factory (HVF) in Avadi. The regiments are based in the western sector.

Advanced Version of MBT Arjun Mark-II To Undergo Serial Production in 2014 ~ ASIAN DEFENCE NEWS
sonicboom is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


LinkBacks (?)
LinkBack to this Thread: http://www.pakistantalk.com/forums/india/8572-advanced-version-mbt-arjun-mark-ii-undergo-serial-production-2014-a.html
Posted By For Type Date
Arjun (tank) Patient Experiences This thread Refback 02-21-2011 09:11 PM


All times are GMT -4. The time now is 02:04 PM.


Powered by vBulletin® Version 3.8.7 - Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.6.0 ©2011, Crawlability, Inc.